Permission for wind farm with tallest structures in Ireland quashed by High Court

business
Permission For Wind Farm With Tallest Structures In Ireland Quashed By High Court
The proposed wind farm was located in bogland known as Mountdillon Peat Production Bog near Lanesborough, in Co Longford.
Share this article

A decision of An Bord Pleanala to grant planning permission to a subsidiary of Bord Na Mona to build a wind farm in the Midlands had been quashed by the High Court.

The proposed wind farm was located in bogland known as Mountdillon Peat Production Bog near Lanesborough, in Co Longford.

Advertisement

In his judgment Mr Justice Richard Humphreys said he was satisfied to uphold a challenge brought by environmentalist Peter Sweetman against the proposed wind farm.

The judge agreed with Mr Sweetman's argument that the decision should be quashed because the application to build the wind farm did not contain the level of detail required to allow the planning authority grant permission.

The court noted that, if constructed to the maximum dimensions, the height of the proposed wind farm's 24 turbines would be the joint tallest structures in Ireland, with a tip height of 185m.

Strategic infrastructure

Permission to construct the wind farm was granted in June 2020. As the proposed wind farm was deemed to be strategic infrastructure the developer made the application directly to An Bord Pleanala.

Advertisement

Mr Sweetman's judicial review action was against An Bord Pleanala, Ireland and the Attorney General.

Among his arguments Mr Sweetman claimed the board had erred in law in accepting an application without an appropriate level of detail in respect of design contrary to EU law and domestic Planning & Development Regulations 2001.

The plans and particulars lodged by the applicant in respect of the turbines which is one of if not the largest series of structures ever to be constructed in Ireland had no detail in terms of their design relative to their particular siting and were completely inadequate, it was also argued.

Consequences

The documents lodged showed virtually no detail and no specific detail and given the scale and extent of the development, and the likely consequences and impacts, it was impossible to formulate any definitive findings in respect of the wind farm's impact, it was further claimed.

Advertisement

The application was opposed. The developer of the proposed wind farm, Bord Na Mona Powergen Limited, was a notice party to the proceedings.

In his judgment Mr Justice Humphreys said Mr Sweetman had complained that core elements of the proposed wind farm's design had been left to the post-consent stage.

In particular, the judge noted that in the application the proposed turbine's heights and blade lengths are expressed in terms of maxima, not the actual proposed dimensions.

That is equivalent to applying for planning permission for a house on the basis that it could be anything from a one-storey bungalow to a ten-storey mansion, and contending that proper details have been furnished as long as a maximum dimension is provided, the judge said.

Advertisement

Worst-case scenario

The board, he said had accepted that typical details of aspects of the development are given rather than precise details, and that everything was assessed on a worst-case basis and that this was sufficient.

"Unfortunately, I don’t consider the “worst-case scenario” defence as really being an answer. It amounts to saying that, to take one of the matters at issue, the blades are going to be of some length, totally unspecified apart from a maximum."

"Does that amount to providing “plans and particulars” of the development? I think not. " he said adding that specifying particulars of the works for which permission is sought is the statutory obligation.

It was not open for a party to seek permission fora project that is open-ended at one end of the scale and which could be anything up to a maximum specified, he added.

Advertisement

The court was also satisfied that the argument was adequately pleaded by Mr Sweetman's lawyers.

In all the circumstances the judge said that the board's decision should be quashed.

The judge did dismiss several other grounds of Mr Sweetman's challenge against the decision including that the decision was contrary to common sense, that irrelevant considerations had been taken into account, and that the decision was unconstitutional.

These arguments, the judge said, had not been established by Mr Sweetman.

Read More

Message submitting... Thank you for waiting.

Want us to email you top stories each lunch time?

Download our Apps
© BreakingNews.ie 2024, developed by Square1 and powered by PublisherPlus.com